ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN MAKABUHAY STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 22
Corner Crack 0.79 l.m 79cm 93cm .5 cm 1 13.88559 120.9135
Transverse Crack 6 l.m 6m 10cm 1 cm 2 13.88564 120.9135
Longitudinal Crack 3.6 l.m 3.6m 7cm .8 cm 1 13.88559 120.9135
2 13.88564 120.9135
Longitudinal Crack 3 l.m 3m 7cm 2.8 cm 4 13.88549 120.9134
5 13.88549 120.9134
Longitudinal Crack 14 l.m 14m 3cm 1.8 cm 6 13.88547 120.9134
7 13.88547 120.9134
8 13.88547 120.9134
Pumping and Ravelling and Potholes 0.3922 sq. m 12 13.88539 120.9133
Measurement for Potholes 53 cm 74cm 3. 2 cm 17 13.88539 120.9133
Rehabilitated Pavement 18 13.88529 120.913
21 13.88516 120.9128
Ilustre Ave/In 21 13.88516 120.9128
Rehabilitated Pavement; /E 22 13.88493 120.9124
Note: Legend: /E - End
1. The data is surveyed last February 23, 2022. /In - Intersection
2. The unit of measure l.m denotes linear meter.
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com