LEMERY, BATANGAS | |||||||||
---|---|---|---|---|---|---|---|---|---|
SURVEYED PAVEMENT DISTRESS IN MAKABUHAY STREET | |||||||||
Defect(s)/Deficiencies | Estimated Quantity | Unit of Measure | Remarks | Length | Width | Depth | No. of Slab | Latitude | Longitude |
Total: 22 | |||||||||
Corner Crack | 0.79 | l.m | 79cm | 93cm | .5 cm | 1 | 13.88559 | 120.9135 | |
Transverse Crack | 6 | l.m | 6m | 10cm | 1 cm | 2 | 13.88564 | 120.9135 | |
Longitudinal Crack | 3.6 | l.m | 3.6m | 7cm | .8 cm | 1 | 13.88559 | 120.9135 | |
2 | 13.88564 | 120.9135 | |||||||
Longitudinal Crack | 3 | l.m | 3m | 7cm | 2.8 cm | 4 | 13.88549 | 120.9134 | |
5 | 13.88549 | 120.9134 | |||||||
Longitudinal Crack | 14 | l.m | 14m | 3cm | 1.8 cm | 6 | 13.88547 | 120.9134 | |
7 | 13.88547 | 120.9134 | |||||||
8 | 13.88547 | 120.9134 | |||||||
Pumping and Ravelling and Potholes | 0.3922 | sq. m | 12 | 13.88539 | 120.9133 | ||||
Measurement for Potholes | 53 cm | 74cm | 3. 2 cm | 17 | 13.88539 | 120.9133 | |||
Rehabilitated Pavement | 18 | 13.88529 | 120.913 | ||||||
21 | 13.88516 | 120.9128 | |||||||
Ilustre Ave/In | 21 | 13.88516 | 120.9128 | ||||||
Rehabilitated Pavement; /E | 22 | 13.88493 | 120.9124 | ||||||
Note: | Legend: | /E - End | |||||||
1. The data is surveyed last February 23, 2022. | /In - Intersection | ||||||||
2. The unit of measure l.m denotes linear meter. |